Lifeform Construction 10+ building, no ressources reimbursed when cancelled

  • ## Bug Title


    When we try to start construction on 10+ buildings for the FDV (Foreign Development Fund), a message appears saying, "One or more associated bonuses are already exhausted. Do you still want to start construction?" If we click "Yes," construction begins, consuming all the resources needed to build the buildings until the resource supply is depleted (if we have enough resources for 6 buildings, only 6 out of 10 will be started).


    However, canceling the construction of building 1 cancels all other constructions but does not refund the resources invested in buildings 2, 3, 4, 5, and 6, which are in the construction queue.


    ## Account Nickname/ID


    Blackangels / 103432


    ## Account Type


    Explorer


    ## Device & Environment


    - Device: Computer, Mac OS


    - OS: MacOS Sequoia 15.6.1


    - Browser: Safari Version 18.6 (20621.3.11.11.3)


    - Scripts/Extensions: No


    ## Steps to Reproduce


    1. Click on the Lifeforms tab


    2. Click on "Start +10 Buildings Under Construction"


    3. Confirm the alert message


    4. The maximum number of buildings, according to the available resources, is started.


    5. Canceling the first building will result in no refund of invested resources.


    ## Expected Result


    The invested resources should be refunded.


    ## Actual Result


    Refund of invested resources only for the first level of the building started.


    ## Frequency


    Always!


    ## Evidence


    Link 1: Sufficient resources at the top (57.7 million crystal units): https://ibb.co/WNN3h1tT

    Link 2: Launch of +10 units for the Microchip Production Chain: https://ibb.co/9mDqqzhC

    Link 3: The next building level costs 4.7 million crystals: https://ibb.co/CpjRKHng

    Link 4: Validation of the message indicating that the associated bonuses are exhausted: https://ibb.co/ymMVjRQZ

    Link 5: 8 building levels in the construction queue and consumption of the resources required for these 8 levels: https://ibb.co/gp1fY7v

    Link 6: Interruption of the 1st building in the queue: https://ibb.co/zTY6kqQ5

    Link 7: Confirmation of the cancellation: https://ibb.co/tPJS7w8H

    Link 8: Once the cancellation is confirmed, I'm left with only 8 million crystal units (refund for the first building) instead of the initial 57.7 million (which would correspond to the refund for the other 8 buildings): https://ibb.co/B57YNpRQ


    Thank you,


    Blackangels.

  • Prongs

    Approved the thread.